Neptune Energy awards contract to CIMC Raffles for Beacon Atlantic

https://www.neptuneenergy.com/en/news-and-resources/news/2019/19-03-2019?lang=en

Beacon Atlantic – Wheelhouse and main deck

Beacon Atlantic wheelhouse and main deck. Great progress in the preparation for painting and the installation of the wheelhouse windows.  

Beacon Atlantic Lower Hull is floating free

                    The Beacon Atlantic lower hull was successfully floated off the barge 22.10.2015.

Project had Effective Date on the 31st December 2013. Project Kick Off meetings were held in January 2014 and the first batch of drawings are being prepared for DnV approval. All major long lead items have been ordered by the shipyard